WElcome !


your new kitchen journey starts here.

WHAT TO EXPECT...

The kitchen is the heart of a home. It is where families gather, meals are prepared, communities are brought in and memories are made. Our team is dedicated to transforming your vision into a reality! We look forward to walking through the process with you, and delivering a kitchen to you that surpasses your expectations!


We have built this webpage with you in mind, to walk you through the construction process from demolition to completion! We hope that it will answer the majority of your questions and take most of the scary, unknown out of the process. Of course, never hesitate to reach out if you have any questions! We're a pretty friendly bunch and always love to talk through any other questions you may have.



If you aren't familiar with our pre-construction process, click this button.

what is

pre-construction?

Design


Plans


Permits


Estimates


Contracts

Kitchen Tools Shelf

Choose the package that's right for you!

STANDARD KITCHEN PACKAGE

Our Standard Kitchen Package includes updating all kitchen features, while keeping existing footprint. This package ranges between $30,000 and $50,000. All appliances remain in the same place, but are updated. New cabinetry, new countertops, new tiling throughout. Plumbing and electrical fixtures remain in same or similar locations, but are upgraded to look new and shiny! This renovation can be expected to take between 6-10 weeks.

CUSTOM KITCHEN PACKAGE

Our Custom Kitchen Package ranges from $45,000 to $75,000 This package involves tearing everything down to the studs, and rebuilding with a fully updated floor plan and unique kitchen features throughout. It is common to add island countertops, specialty appliances like an ice maker or double oven, and the use of higher end materials. This renovation takes up to 12 weeks to complete, as it is more invasive than the standard remodel.

LUXURY KITCHEN PACKAGE

Our LUX Kitchen Package includes top of the line all across the board! You can anticipate an average cost of $70,000 to $110,000 for this package. We will focus on the highest quality materials throughout, intricate and intentional design features from start to finish, and the WOW factor! The Luxury Package will include things like Smart-Home technology integration, specialty appliances, oversized islands, walk-in pantries, and custom specialty cabinetry and countertops. This design caters to your needs and requires 12 weeks or longer to complete because everything is custom-made

FULL KITCHEN PROCESS

Remodel Mood Level %

Smiley Face Icon
Smiley Face Icon
Smiley Face Flat Icon
Flat Smiley Face Icon
Smiley Flat Icon
Kitchen Refrigerator Icon
Ceiling Lamps Energy Electricity Light Flat Icon

Appliance / Fixture Installation

Illustration of Handshake

Meeting & Site Visit

Dollar Sign Icon

Final Invoice

Paintbrush

Painting

Ruler and Pen

Design/Plans/Permits

Trash Can Icon

Demolition

Simple Cute Kitchen Countertop

Countertops

100

75

50

25

0

contract icon

Pre-Construction Agreement

Computer

Order materials

contract icon

Contract

Crossed Hammer and Wrench Icon

Framing

Plain Shoe Icon

Flooring

Lined Cabinet Icon

Trim & Cabinets

Bold Trendy Purple and Black Checkerboard Pattern

Tile

Check list button icon. Check mark in box sign

Punch List

Simple Lined Iron Screw
Simple Lined Iron Screw

Drywall

Dollar Sign Icon

Estimate

Plumbing Logo Vector Icon Design Illustration

MEP Rough-ins

Pre- Construction

(3-6 weeks)

Construction

(8-12 weeks)

PROJECT SCHEDULE

The project schedule is the brain of the operation, essential for every project. For a kitchen, this schedule is very involved, with coordination of ordering materials, subcontractor management and inspection deadlines. We will deliver a project schedule in the form of a gantt chart at the start of your project, and update it as time goes along. We work alongside you to schedule the arrival of all necessary materials before demolition begins to ensure the project runs smoothly and quickly... To the right you'll see what a typical kitchen schedule will look like!

ORDERING MATERIALS

We will coordinate the ordering and delivering of materials with you as the project start date approaches to ensure the seamless execution of the project once construction begins. Materials that are design selections are your responsibility to source. As soon as design work begins, we will share with you a Selections Spreadsheet where you can keep track of all the decisions you need to make about your kitchen and all the materials you need to order.


We will not include the items you order in our estimated project cost as you are the purchaser.

Category

Plumbing Fixtures

Electrical Fixtures

Flooring

Tile

Veneers

Items you will need to purchase and deliver

Sink

Faucet

Pot Filler

Pendant Lights, Fans, Chandeliers, Sconces

LVT, Tile, Hardwood, Brick, Concrete, etc.

Tile Backsplash, Grout, Schluter (tile edge trim)

Thin Brick Veneer,

Stacked Stone Veneer

Recommended Supply Stores:

Ferguson

Home Depot

Lowes

Amazon

Wayfair

Build.com

Overstock.com

LBU Lighting

Home Depot

Lowes

Amazon

Wayfair

Build.com

Overstock.com

Floor & Decor

ProSource Orlando

Home Depot

Lowes

Floor & Decor

ProSource Orlando

Tilebar.com

Home Depot

Lowes



J&N Stone

Floor & Decor

DEMOLITION

It's time to start your project! Demolition may include removal of existing cabinets, countertops, appliances, walls, ceilings, old fixtures and more! It is


important to remember that once demolition begins, you should be prepared to not use your kitchen or surrounding space until the project is completed! Don't worry though, it'll all be worth it in the end.


What to expect:

  • Dumpster is dropped off on street or driveway
  • Area protection is typically installed in areas that are not in the scope of work
  • Removal of existing appliances, countertops, cabinetry, walls, ceilings, flooring and fixtures.
  • All debris will be cleaned and space will be organized daily

FRAMING

Line Frame

If you plan on your kitchen having a different layout than what you had previously, then this is where reframing will take place. Building new walls, headers, openings, or patching up openings will all take place during this stage. Reframing takes place right after demolition, and right before the MEP trades come in.


What to expect:

  • At this point in time, all the old has been removed and we’re ready to build your new layout
  • You can expect this stage to continue on trend with the dust and debris of construction
  • Framing may include new floor to ceiling walls, or just a knee wall for a peninsula or island cabinets
  • Framing isn't always a part of a kitchen remodel. This will generally only take place for custom and LUX packages


MECHANICAL (AKA HVAC)

HVAC stands for Heating, Ventilation, and Air Conditioning. The rough-in phase for mechanical systems may involve removing or relocating AC duct, supplies and returns to fit the new kitchen layout. The goal of this phase is to always ensure proper air circulation and temperature control throughout the renovated space! For kitchen renovations, this is the time our mechanical contractor will rough in your hood range duct work.

What to expect:

  • By this point, the HVAC system has already been turned off quite some time, but we're close to changing that!
  • Supply vents, return vents and above ceiling ductwork will be relocated.
  • Hood range rough-in will be set into its location

ELECTRICAL ROUGH IN

The electrical rough-in stage includes the careful placement of electrical conduits, wiring, and outlets throughout the building. This is the foundation upon which the lighting, power outlets, and technological systems will operate. Planning and precision are crucial to ensure the building's electrical infrastructure can support the anticipated power demands efficiently.

What to expect:

  • Conduits and wires everywhere! Conduits are installed to route electrical wires safely from the main electrical panel to outlets, switches, and fixtures. Proper placement minimizes electrical interference and ensures compliance with safety codes.
  • At this point in the process it is common to have certain breakers turned off to ensure safety in the house.
  • If you are adding an island in your new kitchen, wires will need to be routed under the slab into the new area... this is called "trenching". We will have to cut open the existing slab, run the wires over, then fill it back in with concrete.


Bold Industrial and Tech Elements - pipes

Plumbing rough-in involves the installation of pipes, drains, and fixtures that will provide water supply and disposal within your home. Proper placement of plumbing components ensures effective distribution of water and efficient waste removal, contributing to the overall functionality and comfort of your kitchen. Typically, plumbing and electrical rough in happen simultaneously.

PLUMBING ROUGH IN

Mouse Click Icon

What to expect:

  • Depending on the scale and size of your project, when working on the plumbing rough in, the water supply to the entire home may be shut down. Once everything has been rerouted and reconnected, it will all be turned back on.
  • If you are adding a sink to an island in your new kitchen, the water lines will have to be routed under the slab into the new area... this is called "trenching". We will have to cut open the existing slab and run the water lines over.
Grunge Brush Stroke
Paint Roller, Paint Brush, Paint, Roller, Painter Icon
Watercolor brush stroke
Watercolor brush stroke
Watercolor brush stroke
Watercolor brush stroke
Watercolor brush stroke
Watercolor brush stroke
Grunge Brush Stroke

Drywall and paint will be a portion of the project when you really start to feel the space come together. At this time you will have the ability to incorporate your desired textures, styles, and colors for the area. Drywall can get messy, so this will take place before all of your new, shiny selections arrive! Typically, we will add a base layer of paint at this time, then touch up again at the end of the project.


Watercolor brush stroke
Watercolor brush stroke

DRYWALL & PAINT

Paint Roller, Paint Brush, Paint, Roller, Painter Icon
Blue Rectangle Button Illustration
Mouse Click Icon

What to expect:

  • Drywall will be a fairly quick moving 3 step process where the installers "hang" or screw in the drywall itself. Tape and "mud" (i.e., joint compound) are used to make the joints smooth, and then the walls are textured. There are many different texture styles, so be sure to familiarize yourself with them before they spray.
  • Primer coats are required before paint for new drywall areas. These coats will be applied with rollers.
  • During both of these phases, it is not uncommon to lay floor protection and tape off areas to ensure that paint and drywall mud stay off the areas where they don’t belong.

FLOORING

Flooring can come in all kinds of shapes, sizes, and materials. Selecting flooring will ultimately depend on your taste and lifestyle. Those prioritizing a solid but affordable floor should consider LVP (Luxury Vinyl Plank) flooring. Hardwoods are known for their natural beauty and authenticity, intricate grain patterns and long life-span. You may be looking for clean, symmetrical shapes with limitless variations and durability. In this case, tile's the answer. The options don't end there with slate, brick, stamped concrete, and more!

What to expect:

  • Floors are installed after the slab or subfloor is perfectly flat. This may require the grinding away of unwanted areas. During this stage, the installers will be sure to block off areas in order to contain dust.
  • Self-leveling cement may be applied to fill in low spots, creating a strong, reliable, flat surface.
  • A moisture barrier will typically be applied underneath hardwood & LVP flooring to prevent warping of material.

Flooring

Process

Mouse Click Icon
Mouse Click Icon

View Top Kitchen Flooring Trends of 2023

View our Flooring Page for a more comprehensive dive into flooring.

TIME FOR CABINETRY

In many cases, this is one of the more exciting and important aspects to a kitchen remodel! The cabinetry package is where beauty meets practicality, as it maps out how the rest of the kitchen will look, feel and operate.

What does this process look like?

Dollar Sign Icon
Dollar Sign Icon

CLIENT TIP...

Prepare yourself.


Kitchen cabinetry is typically one of the most expensive portions of a kitchen remodel!

PICK YOUR STYLE

PICK YOUR COLOR

PICK YOUR ACCESSORIES

  • Under Cabinet Lighting
  • Knobs vs. Handles
  • Doors vs. Drawers
  • Drawer Organization
  • Spice Pull-Out Rack
  • Wine Rack
  • Pull Out Shelves
  • Lazy Susan Options

FAQ

  • What comes standard with our cabinetry packages?
    • Everything that we install will be at a minimum full plywood boxes, soft close hinges and drawers.
  • There are so many options... how could I possibly pick it all out?
    • Don't worry! We have designers for that! They'll walk you through all your options and the pricing of each.
  • How long will this process take?
    • Typically, the design process will take 1-2 weeks, processing will take 3-4 weeks and install will take 1-3 days.
Mouse Click Icon

CABINET INSTALL PROCESS

3/

Once the uppers are up, time for lower cabinetry. Typically, this requires a laser level as well, and a hand planer to ensure all tops are equal.

2/

Time to start hanging wall cabinets! We typically follow our laser level, install a ledger board, and hang upper cabinets by drilling each cabinet into studs.

4/

Adjustments and Alignment: Fine-tuning ensures that all cabinet doors and drawers align perfectly, creating a polished and visually pleasing appearance.

1/

Organize and layout cabinetry for installation... Get the laser level out, mark your walls, indicate low points in flooring...

5/

Install Accessories: Enhance your cabinet functionality with interior accessories such as pull-out shelves, lazy susans, and spice racks. Install all door handles or knobs for the final design detail!

Curved Left Arrow
Curved Left Arrow

COUNTERTOPS

Countertops play a central role in your kitchen's design, acting as both a visual design focal point and functional workspace! There are a multitude of options for every style and budget. Take your time with the design process and have fun with this! Match up countertop samples with cabinetry samples, backsplashes and appliances to find the perfect match for your dreamed space.

Granite

Amongst the most affordable of options, granite is known for its durability and natural beauty. Granite countertops are resistant to heat and scratches, making them an excellent choice for busy kitchens.

$$

Quartz

Quartz is an engineered product that mimics the beauty of natural stone with enhanced durability. It is todays most popular choice, due to its wide range of variety of colors and styles. The price is also amongst the most wide ranging of all stone options.

$$$

Marble

Marble countertops embody the elegance of natural stone, cherished for their exquisite beauty and enduring charm. Renowned for their timeless appeal, marble countertops have gained immense popularity as a favored choice among homeowners and designers alike.

$$$$

Interior Hanging Light Illustration

Fixtures

Fixtures will be installed during this time as well. This may include hanging pendant lighting, sconces, sink accessories, pot fillers and more!

NEW APPLIANCES & FIXTURES

By this time, cabinets and countertops have been installed and we're THIS close to having a new wine and dine area!

Isolated Fridge Icon Flat Design

Appliances and fixtures will be one of the last items to round out your project. Typically, an appliance package will include the refrigerator, range, microwave, and dishwasher.

Isolated Stove Icon Flat Design

Specialty appliances may be added to the package, such as custom hood range vents, wine chillers, ice makers, double oven stacks, water filtration systems and more!

BACKSPLASH

Whether it's a tile pattern or a quartz slab, the kitchen backsplash can become a focal point statement or eye-catching accent that also adds a practical water barrier to protect kitchen wall surfaces. They allow for a beautiful finishing touch with many styles and materials to match your preferences.

Tile backsplashes include porcelain, ceramic, stone, and even glass tiles that can be oriented in a variety of patterns and come in unlimited shapes and sizes. This tile style of backsplash requires grout (fine cement-like material that comes in many colors) to fill the space between the tiles.

What to expect:

  • The selection of the material and orientation is chosen by the homeowner. This typically looks like going to Home Depot, Lowe's, Floor & Decor, or searching online to get tile, grout, and schluter.
  • Schluter is another material which is required for tile backsplash. It essentially creates a clean looking border around the tile so that the tile edges don't show.
  • Installation is pretty speedy with little amounts of prep work necessary.


green washi tape
green washi tape
green washi tape
green washi tape

TIME FOR THE PUNCH LIST!

When everything else has been completed, we will perform a detailed sweep of the kitchen and compile a punch list of any outstanding items that need attending. This is where we scrutinize our work, catch any hiding imperfections, and correct them. If there is anything you are unsatisfied with, let us know so we can correct it here.

CLIENT TIP...

No project is perfect until the punch list.

While your kitchen may look 100% complete, it may only be 97%. We want to ensure your full satisfaction, and that's where punch lists come into play. Please be patient with us as we near the end.

Clipboard Icon
green washi tape
green washi tape
Hand-drawn Tape Roll
green washi tape
green washi tape

What to expect:


We'll hand you a roll of blue tape and you can go crazy marking up your kitchen with things that stand out to you as incomplete. Have fun with it!

green washi tape
green washi tape
green washi tape

kitchen Complete! we hope you enjoy it forever!